How to Change Inspection Provider Mid-Cycle

You can change inspection provider at any point in the year. Learn what to ask the outgoing provider for, and how to switch without leaving a gap.

You can change inspection provider at any point in the year, and you do not need to wait for a cycle to end. The examination interval belongs to the equipment and to the regulation it sits under, not to the company that carried out the last examination. A new provider picks up each item on its existing due date. What matters is that nothing is left behind with the outgoing provider, because the records are yours and you will need them.

The risk in switching is not legal, it is administrative. Equipment goes missing from the register, a due date is lost, or a written scheme of examination stays on somebody else's server. All three are avoidable with a short handover list.

What must the outgoing provider hand over?

The documents are the duty holder's records, not the provider's property. Ask for all of it, in a usable format, before the relationship ends.

ItemWhy you need it
All reports of thorough examinationRequired to be kept and available; the next provider works from the last one
Equipment register or asset listSerial numbers and unique identifiers, so nothing is missed
Next due date for every itemThe interval continues regardless of who examines
Open defects and their timescalesAn unresolved defect does not close because the provider changed
Written scheme of examination, for pressure systemsRequired under PSSR 2000; it belongs with the duty holder
Any examination scheme under LOLERWhere intervals differ from the standard maximums, the scheme is the authority for that
PUWER inspection recordsRequired where inspection is needed to ensure safe operation

Two of those are worth spelling out. Under PSSR 2000 the user or owner must have a written scheme of examination drawn up or certified by a competent person before examinations can be carried out against it. If your outgoing provider drew it up and you do not hold a copy, the incoming provider has nothing to examine against, and the scheme may need recreating at your cost. Ask for it explicitly, by name. Our guide on the written scheme of examination explains what a complete one contains.

The second is any examination scheme under LOLER. Where equipment is examined at intervals other than the standard six or twelve month maximums, it is because a competent person has drawn up a scheme specifying those intervals. That scheme is the justification for the interval you are working to. Without it, you cannot explain to anyone why an item is on an eighteen month cycle.

When is the best time to switch?

Any time, but the tidiest point is shortly after an examination has been completed and the report issued. That gives the incoming provider a current report to work from and the longest possible run before the next date falls due, which removes time pressure from the handover.

The point to avoid is switching with an item already overdue, or with an open defect that has not been resolved. Neither is fatal, but both should be raised with the incoming provider at the outset rather than discovered by them. An overdue item means equipment that should not be in use, and that needs addressing before anything else.

Do not assume a gap in the record will go unnoticed because the provider changed. The equipment history is continuous even when the supplier is not.

What should you ask a new provider?

Four questions separate providers meaningfully, and none of them is about price.

Who will actually carry out the examination, and what is their competence? A competent person needs the practical and theoretical knowledge and experience appropriate to the equipment. Ask who attends, not which company they work for. Our guide on who can carry out a LOLER inspection covers what competence means in this context.

Do you also repair, service or sell the equipment you examine? An examination is an independent assessment of whether equipment is safe to remain in service. Where the same business carries out remedial work, the examination and the quotation come from the same place. That does not make the examination wrong, but it is a conflict you should be aware of and weigh deliberately.

How quickly is the report issued, and in what form? The examination is not finished until you have the report. A verbal all clear on the day is not a record, and equipment waiting on paperwork is equipment not earning. Ask for the normal turnaround rather than the best case.

What happens when a defect is found? You want a clear answer about notification, timescales and who tells you, rather than discovering the process during an incident.

One thing no provider can offer, and a claim worth treating as a warning sign, is approval or acceptance of reports by the HSE. There is no scheme under which the Health and Safety Executive approves, accepts or certifies inspection reports. What matters is that the report contains what the regulation requires and was made by a competent person.

What does the incoming provider need from you?

Less than people expect, if the handover list above is complete. The equipment register, the last reports, the due dates and any schemes are enough to build a schedule from.

Beyond the paperwork, the practical things are access, isolation arrangements and someone who can operate the equipment if a functional check is needed. Where equipment is spread across sites or shifts, saying so at the outset avoids a second visit.

Expect to be asked about equipment that is not on the register. Items bought outside a purchasing process, inherited with a building, or hired in and never logged are the usual finds, and it is better to identify them at the start than to discover them a year later.

Making the switch straightforward

Safe-Lee Inspection & Consultancy takes over existing schedules regularly, and the handover is usually a single conversation plus the documents above. We are independent and carry out no repairs, servicing, hire or equipment sales, so an examination has no destination other than the report. Examinations are carried out by a qualified competent person at Safe-Lee, led by Lee Charnock, EngTech MSOE MBES, and reports are issued in one to two working days.